MS AMERA
The scope of work included the refurbishment of wet units in passenger cabins. We were responsible for the replacement of drainage systems using plastic push-fit systems, with connections made in the technical spaces from the corridor side. We also executed structural modifications to the shower trays – including direct intervention into the steel bases and tile lining, as well as the installation of sheet metal components – along with the necessary supplementary interior finishing works.
